Building the Future

Terminal 3

More

Building the Future

A Past and Future Saga

More

Building the Future

The New Terminal 3

More

Building the Future

New Facilities in the South of the Airport: The First and Second Construction Phase

More

Building the Future

A Modern, Clearly Structured Architecture

More

Building the Future

Shop, Rest, Have Fun …

More

Building the Future

Excellently Connected

More

Building the Future

The Fascination of a Large Construction Site

More

New Facilities in the South of the Airport: The First and Second Construction Phase

The terminal‘s design intends for construction to be carried out in three sections flexibly aligned to capacity requirements. In the first construction phase, the main building with arrival and departure levels as well as the marketplace, lounges and an automated baggage handling system will be built. In addition, the two piers H (Schengen) and J (Non-Schengen), with lengths of 400 and 600 meters respectively, will be built.

The second construction phase will see Pier G realized as a fully-fledged and modern terminal building which will be integrated into Terminal 3. At a later date and depending on demand, this third pier can be expanded by about 200 meters.

Adaptable to the Future

Thanks to the modular and flexible architecture, Fraport can realize the new terminal according to actual capacity requirements. Construction work on Pier G is already well advanced. This gives Fraport the flexibility to put it into operation earlier, if necessary, while the much more complex main terminal building with piers H and J is still under construction.